Wednesday, February 7, 2018

Section: 12
Hours: 6

I drilled, deburred, dimpled, counter sunk and pull riveted the left and right elevator tips today. During the initial drilling and cleco step, I inserted popsicle sticks trimmed to length to force the tips wide enough to match up to the elevator skins without gaps. After the initial holes were drilled and clecoed, the gaps stayed closed.


No comments:

Post a Comment