Monday, May 7, 2018

Section: 46B
Hours: 6

While I'm waiting for the wheel bearing grease and tire talc to arrive I decided to start work on the fiberglass wheel and gear leg fairings, Chapter 46B. I spent day the trimming the wheel fairing parts. The scribe lines are a little hard to see so I ran a tape line on them. I cut within a 1/16 inch of the tape line using the dremel tool with a cut off wheel. I run the shop vac at the same time as I cut with the dremel tool to capture the dust. Then I sand to the scribe line using a long sanding board. I taped a strip of sanding paper to the cardboard core from a tape roll for sanding the inner radius of the curved sections.



No comments:

Post a Comment