Section: 29
Hours: 5
I built a stand that attaches to the spar carry throughs that holds the fuselage on the table to facilitate riveting the two sections together. I had to run over to Lowe's to find some bolts long enough to hold the assembly. A 2/4 is not quite thick enough, so I glued on a couple of plywood spacers to make up the difference.
Here's the fuselage clamped onto the table and clecoed together.
Next step is to run a bead of ProSeal along the joint between the two assemblies.
Here's the view from the other side.
No comments:
Post a Comment