Section: 38
Hours: 5
I started assembling the forward canopy frame bulkheads. I'm still missing the 2nd hinge assembly. Hopefully it arrives soon...
Disclaimer: This blog is to provide others insight into my experience and for my own historical purposes. Airplane construction is a serious affair. I have no authoritative skills relating to airplane construction. As such, any use of the information contained on this blog is at your own risk.
Section: 38
Hours: 5
I started assembling the forward canopy frame bulkheads. I'm still missing the 2nd hinge assembly. Hopefully it arrives soon...
Section: 38
Hours: 7
I started riveting the canopy together and primed the remaining canopy frame parts today.
Section: 38
Hours: 7
I restored my paint booth, got out the paint gun and applied primer to the new canopy frame parts. The roll over frame was undamaged and I was able to cleanly remove it from the canopy frame so I will reuse it in the rebuild. This will be good because all the screw holes will perfectly match those already in the plexiglass.
Section:
Hours: 0.5
When I checked out the navigation lights I discovered the tail light only operated in strobe mode. I ordered a new tail light from FlyLeds that supports nav plus strobe operation. It also nicely fits in the rudder tail fairing which will simplify installation.
Section: 38
Hours: 7
I used the Dremel tool with circular cutoff disk to make a couple of slices in the fiberglass fairing skirt on the canopy. Then I carefully wedged toothpicks under the fiberglass to get it to part from the canopy frame and plexiglass. The epoxy does not form a chemical bond to aluminum, so I was able to break the mechanical bond with some effort. This is why it is so important to do a good job of roughing up the aluminum and plexiglass before laying up the skirt.
The skirt cleanly came off in 1 large piece after applying tooth pick wedges under it. Here you can see the glass bead/resin fillet and fiberglass layers and the underlying rough aluminum skin and plexiglass. You can also see the aluminum clips that hold down the edge of the plexiglass.
Here is the plexiglass after removing it from the frame. Luckily it came apart cleanly and I will be able to reuse it.Section: 38
Hours: 8
Deja vu- worked on assembling the canopy frame. I tell all my friends that I'll build my second RV in half the time. Well, that might be a little bit of an exaggeration, but it is definitely easier the second time around.
Section: 38
Hours: 2
I started transition training with Stan Lawrence in his beautiful RV-14 with IO-360 fixed pitch prop and Advanced Flight Systems / Dynon panel. My RV14 has IO-390 with variable pitch prop and Garmin, but the airframes are the same. Hopefully skills learned will apply to both airplanes. The 14 is a dream to fly- great visibility, great performance, coordinated controls and light touch.
The good folks at Vans kitted up all the parts for rebuilding the canopy. The crate arrived this afternoon and I had Woody give it a good inspection before signing off on delivery. Unfortunately only 1 of the hinge hanger pieces arrived, the other one is back ordered.