Section:
Hours: 5
Today we sucessfully ran the engine for the first time.
Disclaimer: This blog is to provide others insight into my experience and for my own historical purposes. Airplane construction is a serious affair. I have no authoritative skills relating to airplane construction. As such, any use of the information contained on this blog is at your own risk.
Section:
Hours: 5
Today we sucessfully ran the engine for the first time.
Section:
Hours: 6
I borrowed / rented electronic scales from the Placerville EAA Chapter. The scales come in a solid shipping box and include a couple of ramps for rolling the wheels up onto the scales.
I assembled all the access covers, put in all the interior (seats, carpeting, side panels), topped off the engine oil and added the wheel pants so the weight would reflect the actual flying condition of the airplane.
I enlisted some friends from the airport to help lift the tail onto some saw horses to put the airframe in flying attitude. After carefully adjusting the tail height to level the canopy rails, we and rolled the airplane onto the scales. Unfortunately, on the first try I forgot to push the tare button before we rolled the wheels onto the scales so we had to roll the airplane off the scales and start over. Lesson learned...Section:
Hours: 8
I had a local sign shop prepare registration number decals and I applied them to the vertical stab. I used masking tape on the top edge of the decal to position and hold it in place. Then I removed the back carrier layer and rubbed the letters down and finally I peeled off the top carrier film.
Section: 38
Hours: 6
I sanded and profiled the canopy skirt to final shape and applied a top coat of clear epoxy to seal the micro balloon filler.
Section:
Hours: 4
When I looked at the cockpit this morning I noticed there was brake fluid on the floor. I had left the parking brake on for several days and it looks like pressure caused the line to disconnect at the firewall connection. It appears the line was not inserted far enough into the ferrel before I tightened the nut. I replaced the existing ferrel with a new one, inserted the line more securely and re torqued the nut. For good measure, I replaced the ferrel on the other firewall connection also. After refilling the brake lines it appears to be holding the pressure with the parking brake on.
Section:
Hours: 6
I added the control linkages to the tail wheel. The chains as supplied were too long so I removed a couple links from both sides.
I also installed the scat tubing from the plenum to the oil cooler.
The aileron servo is not working. I believe the mini molex connector has some bad wiring so cut off the connector and crimped on a set of pins to the exiting wires and plugged them together and applied shrink tubing over the pins to ensure they don't pull apart. The servo now works.