Sunday, November 4, 2018

Section: 46B
Hours: 2

I cleaned up the upper fairing trailing edges. Just about finished with section 46B. The wheel fairings are a lot of work!!!

Section: 47
Hours: 2

I started work on the engine air intake snorkel. The fiberglass flange bolt holes must be drilled and the snorkel must be aligned with the engine. Here I've used the template provided in the kit to locate the bolt holes.

To aid aligning the snorkel with the engine, I built an aluminum spacer plate with a composite board circular hole that will be inserted in the engine inlet hole and align with the flange of the snorkel.


No comments:

Post a Comment