Tuesday, July 17, 2018

Section: avionics
Hours: 5

I tried running the cabin wiring with the elevator and control stick pushrods in place, but there just wasn't enough room. Unfortunately, the wiring end connectors are already attached and it is impossible to squeeze them through the central tunnel when the push rods are in place. It was a hard job putting these push rods in place and it was equally hard removing them. I'm sure it will be difficult to put them back in after the wiring is done :-(

The wiring going to the wing will have to be modified to attach to the FlyLeds...

No comments:

Post a Comment