Section: avionics
Hours: 4
We ran out of circuits on the VPX pro so SteinAir added a circuit breaker box to handle the overflow. I made a mounting bracket to hold the breaker box onto of the VPX box. It will be easy to run power and ground from this box to the terminals on the back of the VPX.
Disclaimer: This blog is to provide others insight into my experience and for my own historical purposes. Airplane construction is a serious affair. I have no authoritative skills relating to airplane construction. As such, any use of the information contained on this blog is at your own risk.
Wednesday, December 12, 2018
Tuesday, December 11, 2018
Section: avionics
Hours: 7
The avionics wiring harness has a large bundle of ground wires, none of which were labeled by SteinAir. To make future debugging easier, I decided to chase down where these grounds go and then label them.
In the process of doing this task I discovered that several pins in the P1001 connector at the back of the tray for the GTN 650 were bent.
This is really unfortunate. This connector is one of the most complex in the whole panel and it is buried deep behind the panel where it will be EXTREMELY difficult to access for repair. Going to have to get SteinAir advice on this one :-(
Hours: 7
The avionics wiring harness has a large bundle of ground wires, none of which were labeled by SteinAir. To make future debugging easier, I decided to chase down where these grounds go and then label them.
In the process of doing this task I discovered that several pins in the P1001 connector at the back of the tray for the GTN 650 were bent.
This is really unfortunate. This connector is one of the most complex in the whole panel and it is buried deep behind the panel where it will be EXTREMELY difficult to access for repair. Going to have to get SteinAir advice on this one :-(
Saturday, December 8, 2018
Section: avionics
Hours: 4
The SteinAir wiring harness I purchased is not very well documented. Some tasks are left for the builder to figure out. Wiring the starter switch is one of those tasks...
Here is the documentation for the ignition key switch. Of course it is labeled for traditional mags.
With the PMags, we want to be able to test if each mag is generating power independent of the battery/alternator. My installation has a circuit breaker for each p mag and also a momentary switch to isolate each p mag from bus power. In the NORM position, power to the p mag is provided from the aircraft bus, in the TEST position, the bus power is disconnected so you can test if the p mag's internal power generation is working.
Here is the key switch wiring. The blue wires go to the left and right p mags, the red wire goes to the starter.
Hours: 4
The SteinAir wiring harness I purchased is not very well documented. Some tasks are left for the builder to figure out. Wiring the starter switch is one of those tasks...
Here is the documentation for the ignition key switch. Of course it is labeled for traditional mags.
With the PMags, we want to be able to test if each mag is generating power independent of the battery/alternator. My installation has a circuit breaker for each p mag and also a momentary switch to isolate each p mag from bus power. In the NORM position, power to the p mag is provided from the aircraft bus, in the TEST position, the bus power is disconnected so you can test if the p mag's internal power generation is working.
Here is the key switch wiring. The blue wires go to the left and right p mags, the red wire goes to the starter.
Wednesday, December 5, 2018
Section: avionics
Hours: 4
The FlyLeds tail position light I purchased does not fit in the tail cone fiberglass fairing. I was able to disconnect the pc board from the light assembly for mounting further forward in the fairing. Today I fabricated a shielded cable to connect the light back to the pc board.
Hours: 4
The FlyLeds tail position light I purchased does not fit in the tail cone fiberglass fairing. I was able to disconnect the pc board from the light assembly for mounting further forward in the fairing. Today I fabricated a shielded cable to connect the light back to the pc board.
Monday, December 3, 2018
Section: avionics
Hours: 5
I continued to sort out the panel wiring.
Here you can see how I mounted the GTX45 transponder and piggy backed the GEA24 engine monitor. The GTX45 tray is mounted inside of the canopy frame (black marker line on sub panel) and tilted so that when the GTX45 is slide out of the tray it will slide over the top of the side rail.
The VPX circuit controller is mounted on a swing down panel. I mounted the light dimmers on the side of the front panel support bulkhead. The GAD29 mounts to the sub panel. Not visible in this picture, the IBBS backup battery is mounted behind the sub panel behind the GAD29.
I've left the light dimmer pots loose because SteinAir did not bother to label them and I won't know which panel hole to put them in until I can power up the system and try them out.
The under side is not so pretty. The SteinAir cables connect everything, but the layout under and behind the panel is left to the builder to sort out. Lots of unbundled wires for misc. connections in the cabin (lights, usb charger port, smoke oil pump, etc.) This is a labor intensive operation...
To support the wiring going to the firewall I added an aluminum channel between the firewall and the sub panel (middle right of picture below).f
Hours: 5
I continued to sort out the panel wiring.
Here you can see how I mounted the GTX45 transponder and piggy backed the GEA24 engine monitor. The GTX45 tray is mounted inside of the canopy frame (black marker line on sub panel) and tilted so that when the GTX45 is slide out of the tray it will slide over the top of the side rail.
The VPX circuit controller is mounted on a swing down panel. I mounted the light dimmers on the side of the front panel support bulkhead. The GAD29 mounts to the sub panel. Not visible in this picture, the IBBS backup battery is mounted behind the sub panel behind the GAD29.
I've left the light dimmer pots loose because SteinAir did not bother to label them and I won't know which panel hole to put them in until I can power up the system and try them out.
The under side is not so pretty. The SteinAir cables connect everything, but the layout under and behind the panel is left to the builder to sort out. Lots of unbundled wires for misc. connections in the cabin (lights, usb charger port, smoke oil pump, etc.) This is a labor intensive operation...
To support the wiring going to the firewall I added an aluminum channel between the firewall and the sub panel (middle right of picture below).f
Sunday, December 2, 2018
Section: avionics
Hours: 4
I mounted the backup alternator controller on the back side of the map box door.
The grounding bus will be mounted on the other side of the door. The braided grounding cable runs from the firewall to a terminal on the LR3C controller. The bolt runs through the door and attaches the grounding plane on the other side.
Hours: 4
I mounted the backup alternator controller on the back side of the map box door.
The grounding bus will be mounted on the other side of the door. The braided grounding cable runs from the firewall to a terminal on the LR3C controller. The bolt runs through the door and attaches the grounding plane on the other side.
Saturday, December 1, 2018
Section: avionics
Hours: 6
Spent the day on my back under the panel securing the wiring harness.
I tied lots of these today:
Hours: 6
Spent the day on my back under the panel securing the wiring harness.
I tied lots of these today: