Section: 6
Hours: 8.5
This time around I paid more attention to rivet orientation on the spar and extensively used the squeezer instead of shooting the rivets. The results were much better. No smilies and the shop heads are all proper height and width.
Disclaimer: This blog is to provide others insight into my experience and for my own historical purposes. Airplane construction is a serious affair. I have no authoritative skills relating to airplane construction. As such, any use of the information contained on this blog is at your own risk.
Showing posts with label Section 6. Show all posts
Showing posts with label Section 6. Show all posts
Saturday, October 3, 2015
Friday, October 2, 2015
Thursday, October 1, 2015
Section: 6
Hours: 8
Last week I went back and inspected the parts I had already fabricated. After looking at the vertical stabilizer I realized that I could do much better on the riveting and overall fabrication. I also started thinking about how the first part of any RV that pilots pick on is the vertical stabilizer because everyone knows most of the mistakes will show up there because everyone cuts their teeth on it. So I ordered a new set of vstab parts from Vans. The parts arrived over the weekend and I decided to spend a couple days to build a better vertical stabilizer.
Today I spent polishing edges, match drilling and deburring holes.
Hours: 8
Last week I went back and inspected the parts I had already fabricated. After looking at the vertical stabilizer I realized that I could do much better on the riveting and overall fabrication. I also started thinking about how the first part of any RV that pilots pick on is the vertical stabilizer because everyone knows most of the mistakes will show up there because everyone cuts their teeth on it. So I ordered a new set of vstab parts from Vans. The parts arrived over the weekend and I decided to spend a couple days to build a better vertical stabilizer.
Today I spent polishing edges, match drilling and deburring holes.
Subscribe to:
Posts (Atom)