Section: 38
Hours: 4
Here is the new canopy frame next to the old frame. Next up is painting.
Disclaimer: This blog is to provide others insight into my experience and for my own historical purposes. Airplane construction is a serious affair. I have no authoritative skills relating to airplane construction. As such, any use of the information contained on this blog is at your own risk.
Section: 38
Hours: 8
I sanded down the fiberglass layup to match the contours specified in the manual. Then I applied epoxy glass bead filler to smooth over pinholes and build up the contour in a couple low spots. Then I mounted the canopy back on the fuselage and buttoned everything up because I will be taking at least a month off while I go through surgery to donate a kidney to my brother up in Seattle.
Section: 38
Hours: 8
I sanded and roughed up the canopy frame skirt area and plexiglass for fiberglassing, applied an epoxy and glass bead fillet and then layed up the fiberglass skirt. I used lots of black pigment this time to ensure the view from inside the cockpit will not show any light areas at the fillet area.
Section: 38
Hours: 6
I riveted the side skirts on, inserted the back shims and bolted the plexiglass in place. Everything fit really well and the canopy opens and closes smoothly.
Section: 38
Hours: 6
I transported the plexiglass to the airport and fitted it on the canopy frame. Luckily the rebuilt frame almost exactly matches the original so I did not have to do any reshaping of the plexiglass.
Section: 38
Hours: 7
I was able to fit the canopy frame in the back of my Rav4 and transport it to the airport today. The canopy to fuselage fit appears satisfactory although perhaps not quite as good as the original.