Saturday, March 10, 2018

Section: OP-52A
Hours: 2

When I pulled out the wing light kits I discovered they were missing the hardware bags. Van's was very responsive and quickly shipped the missing hardware bags for the wing lights. Today I assembled the brackets to the lights.

Section: 19
Hours: 3

I fit the second wing tip and drilled holes. In addition to the strap to pull the tip into the leading edge I used duct tap to pull the fiberglass into the wing to close the gaps before drilling and clecoing.
 So far I'm satisfied with the trailing edge alignment.

No comments: